1. Identifying potential variables is a crucial task. Setting various quantitative parameters and data, as well as quantitative evaluation criteria, in human, machine, material, method, environment, and measurement is an effective means of monitoring potential variables
2. To identify the required variables, there must be a corresponding change process to support the entire change, so as to prevent problems before they occur, conduct sufficient verification before making changes, and personnel from different departments should carry out corresponding joint work according to the changes
1. Current situation investigation - focusing on major issues and contradictions
2. Reason analysis - it is necessary to break through the sandbox and continue to delve deeper;
3. Identify the main causes and develop countermeasures accordingly;
4. Develop a detailed set of implementation strategies (sample table content) using 5W1H methods;
5. Implementation measures: implement each condition in a practical manner and put it on everyone's head;
6. Check the effectiveness: Firstly, it is necessary to compare with the target value from multiple perspectives, levels, and aspects (technology, quality, process, user feedback);
7. Develop consolidation measures: institutionalize and standardize successful experiences and processes; Permanently transform and write quality management standards, management systems and methods, and revised process document numbers using documented materials;
8. Remaining issues and next steps: Existing issues and next steps