找回密码
 立即注册

QQ登录

只需一步,快速开始

查看: 1086|回复: 9

QMS中变更管理

[复制链接]
发表于 2023-11-7 13:15:47 | 显示全部楼层 |阅读模式

马上注册,结交更多好友,享用更多功能,让你轻松玩转质量管理社区。

您需要 登录 才可以下载或查看,没有账号?立即注册

×
1、识别潜在的变量是重头戏,在人、机、料、法、环、测里,设定各种定量的参数与数据以及定量考评依据,是监控潜在变量的有效手段
 楼主| 发表于 2023-11-7 13:16:52 | 显示全部楼层
1. Identifying potential variables is a crucial task. Setting various quantitative parameters and data, as well as quantitative evaluation criteria, in human, machine, material, method, environment, and measurement is an effective means of monitoring potential variables
 楼主| 发表于 2023-11-7 13:17:24 | 显示全部楼层
2、识别需要的变量,就要有相应的变更流程来支撑整个变更,做到防患于未然,做好充分的验证后进行变更,并且不同部门的人员要根据变更做好相应的连带工作
 楼主| 发表于 2023-11-7 13:18:21 | 显示全部楼层
2. To identify the required variables, there must be a corresponding change process to support the entire change, so as to prevent problems before they occur, conduct sufficient verification before making changes, and personnel from different departments should carry out corresponding joint work according to the changes
 楼主| 发表于 2023-11-7 13:18:58 | 显示全部楼层
质量改进
1、现状调查——抓主要问题和主要矛盾
2、原因分析——一定要打破沙锅问到底、一直深入下去 ;
3、确定主要原因,由此制定对策;
4、制定详细的一整套实施对策(样表内容) 5W1H方法;
5、实施对策:条条件件落实到实处、落到每个人头上;
6、检查效果:首先要和目标值对照、要从多角度、多层次、多方面检查对照(技术、质量、工艺、用户反映);
7、制定巩固措施: 把成功的经验和工艺制度化、标准化;用文件化的东西永久性的进行改造写出质量管理的标准、写出管理的制度办法、写出修改后的工艺文件编号;
8、遗留问题和下步打算:存在问题和下一步的打算

 楼主| 发表于 2023-11-7 13:19:34 | 显示全部楼层
quality improvement



1. Current situation investigation - focusing on major issues and contradictions



2. Reason analysis - it is necessary to break through the sandbox and continue to delve deeper;



3. Identify the main causes and develop countermeasures accordingly;



4. Develop a detailed set of implementation strategies (sample table content) using 5W1H methods;



5. Implementation measures: implement each condition in a practical manner and put it on everyone's head;



6. Check the effectiveness: Firstly, it is necessary to compare with the target value from multiple perspectives, levels, and aspects (technology, quality, process, user feedback);



7. Develop consolidation measures: institutionalize and standardize successful experiences and processes; Permanently transform and write quality management standards, management systems and methods, and revised process document numbers using documented materials;



8. Remaining issues and next steps: Existing issues and next steps

发表于 2023-11-7 13:49:41 | 显示全部楼层
thanks for good sharing.
发表于 2023-11-7 14:19:53 | 显示全部楼层
志利 发表于 2023-11-7 13:49
thanks for good sharing.

近期我和高版主在活跃英语学习版块,引导论坛访问者关注六西格玛版块

评分

1

查看全部评分

发表于 2023-11-8 10:50:32 | 显示全部楼层
全过程管理的应用很重要。大的制造企业已经在应用了
 楼主| 发表于 2023-11-9 08:48:32 | 显示全部楼层
rookie 发表于 2023-11-8 10:50
全过程管理的应用很重要。大的制造企业已经在应用了

是的  质量管理要贯穿产品的整个生命周期
您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

手机版|小黑屋|QPDCA平台自律公约|QPDCA质量论坛 ( 苏ICP备18014265号-1 )

QPDCA质量论坛最好的质量管理论坛 GMT+8, 2024-12-4 09:40 , Processed in 0.096258 second(s), 17 queries , Gzip On.

无锡惠山区清华创新大厦901室0510-66880106

江苏佳成明威管理咨询有限公司 版权所有

快速回复 返回顶部 返回列表