A. Approval, distribution, and modification of internal documents:
1) The engineering drawings have been issued and used without approval;
2) The homework instructions were not distributed to specific job positions;
3) The work instructions hanging on the production site are not controlled;
4) The process file has the phenomenon of being directly modified on the file, and the file modification program has not been executed.
B. Identification, collection, and distribution of external documents: 1) Failure to fully identify and collect national/international, and industry standards related to the product;
2) Failure to distribute external documents to relevant departments such as Quality Control and Production
1) The statistics of quality objectives failed to provide raw data, making it impossible to grasp the authenticity of the final target statistical values;
2) Quality objectives are statistically analyzed but not analyzed
1) Incomplete input information or failure to provide input materials for management review;
2) The management review host is not the top management and fails to provide proof of authorization from the top management to the host (when not the top management themselves);
3) There is no evidence of measures taken regarding management review resolutions, such as corrective or preventive measures;
4) There are no records of the tracking results of the last management review resolution matters