找回密码
 立即注册

QQ登录

只需一步,快速开始

查看: 1373|回复: 6

20分鼓励中文翻英文1,你来练练

[复制链接]
发表于 2012-10-12 11:13:04 | 显示全部楼层 |阅读模式

马上注册,结交更多好友,享用更多功能,让你轻松玩转质量管理社区。

您需要 登录 才可以下载或查看,没有账号?立即注册

×
1.作业员未将电机铆钉放在塑料盒内,开关铆接工作台未清理干净,残存了电机铆钉,作业员在进行开关铆接时将工作台上的电机铆钉连同开关组件一起拿起铆接,混入的1只电机铆钉在铆接时被卡在开关端子下面,由于开关外围没有被列入重点检查内容,这种不良现象在经过后续工序没有被检查出来。
2.修改5S管理规定,要求作业员将电机铆钉统一放在塑料盒内,不得直接放在工作台上,防止混入别的零件或组件内,列入5S检查表内,作为车间日常重点管理内容之一。
3.修订工艺文件,在进行计算机检测工序增加作业员对开关外围进行100%目视检查。
发表于 2012-10-12 16:00:33 | 显示全部楼层
1.作业员未将电机铆钉放在塑料盒内,开关铆接工作台未清理干净,残存了电机铆钉,作业员在进行开关铆接时将工作台上的电机铆钉连同开关组件一起拿起铆接,混入的1只电机铆钉在铆接时被卡在开关端子下面,由于开关外围没有被列入重点检查内容,这种不良现象在经过后续工序没有被检查出来。
1.Operator didn't put the motor rivet into the tray,in the meantime,the switch riveting workbench is not clean,leads to leave some motor rivets on workbench,when operator was running riveting with taking the switch assy and motor riveting together,one motor rivet mixed in welding process was stuck under the switch terminal; aside from that, because of no critical inspection around the switch, it leads to not check out in subsequent handlings.
2.修改5S管理规定,要求作业员将电机铆钉统一放在塑料盒内,不得直接放在工作台上,防止混入别的零件或组件内,列入5S检查表内,作为车间日常重点管理内容之一。
2.Modify 5S management item to require operator must put motor rivet into the tray, and not allowed to put them on the workbench directly, prevent unrelated assy to mix together, add this inspection into the 5S management  daily check list.
3.修订工艺文件,在进行计算机检测工序增加作业员对开关外围进行100%目视检查
3.Correct the technological document, add one more section of 100% visual inspection before PC check.

评分

1

查看全部评分

 楼主| 发表于 2012-10-12 16:02:20 | 显示全部楼层
欢迎各位参与英语学习版块的交流,让这个版块不再冷清
发表于 2012-10-12 22:46:22 | 显示全部楼层
1. The operator did not place the motor rivet in the plastic tray. In the meantime, the switch riveting workbench was not cleaned, as a result some motor rivets were left on the workbench. When the operator was performing the riveting, the rivets on the workbench and switch components were picked up. One of the rivets left on the workbench was stuck underneath the switch terminal. This defect was not detected in the following processes because the critical inspection did not include the inspection of the outside of the switch.  
2. Update 5S requirements. All the motor rivets shall be laid in the plastic tray, and it is forbidden to place the motor rivets on workbench in order to prevent the rivets from being mixed up with other parts and/or components. This is one of the key routine inspection items on the 5S checklist.
3. Revise technological document. Prior to the computer inspection, 100% visual inspection shall be performed.

评分

1

查看全部评分

发表于 2012-10-13 10:15:20 | 显示全部楼层
学习了。。。。
发表于 2012-12-28 19:05:36 | 显示全部楼层
铆钉少了,如何避免?达到零缺陷?
发表于 2012-12-28 19:14:51 | 显示全部楼层
本帖最后由 MikeWang 于 2012-12-28 19:39 编辑

铆钉少了,如何避免?达到零缺陷?100%交叉全检?
How to resolve the problem of missing rivert? To insure every part perfect.100% cross-checking?
您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

手机版|小黑屋|QPDCA平台自律公约|QPDCA质量论坛 ( 苏ICP备18014265号-1 )

QPDCA质量论坛最好的质量管理论坛 GMT+8, 2024-9-19 09:28 , Processed in 0.111503 second(s), 21 queries , Gzip On.

无锡惠山区清华创新大厦901室0510-66880106

江苏佳成明威管理咨询有限公司 版权所有

快速回复 返回顶部 返回列表