4. After the first and second level maintenance of the equipment, it is required to meet the equipment integrity standards and conduct inspection and acceptance.
5. At the beginning of the year, each branch shall, according to the operating accuracy of the equipment, formulate the first and second equipment maintenance plans of each branch, and report them to the Production Equipment Section, which shall summarize and sort them out and distribute them to each unit. Each unit shall organize the implementation according to the production situation, and report the completion of the plan to the Production Equipment Section before the 5th of each month